
The 72-Hour Audit Fix: Why a UPS Alone Wasn't Enough
A customer called 72 hours before an audit, certain they needed an emergency UPS shipment. The real fix involved a corroded breaker, a neglected 200A transfer switch, and a spark plug nobody had replaced.
Read article →